UNDERPASS AT MICHELANGELO ROAD COMPLEX, TIMISOARA

Beneficiary: MUNICIPALITY OF TIMIȘOARA
Country: Romania
Financing: Non-refundable European Funds
Value of investment: Eur 15.5 mil

Total length: 583 m (111 m – covered area)

Services provided:

Feasibility Study, Technical Specifications, Technical Design, Working Drawings

Project description:  

The underpass was part of a larger project providing traffic flow in the central area of ​​the city, at South of Bega canal..

The underpass is provided with:  

two 2 x 5.5 m wide traffic lanes (one on each direction)two technical sidewalks (one for each path)

Vertical clearance: 5 m