Beneficiary: CNAIR
Country: Romania
Financing: EBRD and the Government of Romania
Length: 622 m
Services provided:
Technical Design, Working Drawings, Construction Supervision
Project description:
The objective is part of the construction of the Pitesti municipality Bypass. The overpass is located on the direction of the Pitesti – Ramnicu Valcea Ring Road and aims to underpass both the existing intersection and the railway connecting Pitesti and Curtea de Argeș.
Underpass width: 12.5 m
• two traffic lanes (one on each direction)
• two technical sidewalks (one for each path)
Vertical clearance: 5 m