Căderea Bastiliei nr. 65

București, România

Telefon

+4 021 316 4018

Mail

office@searchltd.ro

PIPERA ROAD OVERWIDENING

Beneficiary: BUCUREȘTI MUNICIPALITY CITY HALL
Country: Romania
Financing: Local budget
Value of investment: Eur 31 mil
Length: 1500 m

Provided services:

Technical Design, Working Drawings, Technical Specifications, Technical Assistance

Project description:

Șoseaua Pipera road is located in the northern part of the city of Bucharest. Many office buildings serving the capital’s business community have been developed in the area.

The project works:

• Overpass on the direction of Șoseaua Pipera
• Șoseaua Pipera overwidening to 6 traffic lanes in the affected area
• Restoration of the road movements affected by the underpass
• Provision of water drainage by providing rainwater sewerage

Description of the overpass characteristics:

Loading class: “E”, (A30, V80)
Length: 474 m
Clearance: 5.5 m

Solution:

4 continuous beams and a 3-span frame with two fixed knots.
Superstructure – precast prestressed beams of low height (1.03 m). The cross distribution of the entire network of continuous precast beams is achieved by means of an overconcreting slab (15-29 cm).
In cross-section, the overpass has a carriageway provided with four traffic lanes, 3.50 m wide each, bordered on the outside by service sidewalks, 1.00 m wide each.